« ryans 10.31 @ 133 pass at maple grove | Main | coreys truck is done »

Monday, August 09, 2010

late night busa finish

ok, couldnt sleep after working on coreys truck all night, got up, went to the garage...

used the 10 dollar harbor freight chain rivet tool, and it fucking worked great, i would recommend it to anyone, you have to have some patience to get everything in the way you want, and then get it done. so after that i adjusted the chain. going to raise the back end of the bike a tiny bit on teh links, one or two more, till i can cut up the box on the back of the swingarm and etc.

filled the bike with water, installed the shift linkage rearset and bent back all the stock parts for the shift linkage and got it all working great actually hahha. re-ran all the wiring in the front end, used teh factory zip ties and etc. mounted the front end fuse box. gutted the stock air box to the Big airbox mod. threw filter in the garbage, mounted the stock tank, connected all the fuel lines etc.

fitted the stock overflow tank, filled the front tire with air (it looses air somehow) im sure i did some other small things im forgetting...

Posted by Mott at 5:04 AM
Categories: drag busa