« bike exhaust | Main | Icebox, Springs, Fuel Fitting »
Monday, February 19, 2007
Icebox done, one spring done
The goal at the dyno today, was to finish the icebox (mounting, drain, and burp the system again) and then install the front drag springs, because the ones that are in are too low, and arent the best performers for the dragstrip. So we came up with the idea to just weld the bolts to the floor and use steel spacers to hold the box up around the spare tire concave, it fits tight and works great, it couldent have come out better. Now onto the front left spring, this was so much of a hassle i dont even want to waste more time talking about it, it took damn near 3.5 hours to get the spring in. Here are some pics, im particularly happy about how the icebox came out, wait till we cut the carpet to fit around it it will look amazing.



